House Update #4



Our foundation is taking longer than most would because our heating and air is going into the slab instead of through the ceiling.

More expensive, but much more efficient.

They have prepped our stem wall for concrete and the slab should be poured soon - though we received a much-needed downpour today (with rain in the forecast through the weekend) which prevents our contractors from pouring concrete.

I want our house done, but I am thrilled to have some rain.  The slab can wait.

Cheers -